{
  "schema": "vedokrok.public-item.v1",
  "release_id": "VEDOKROK-SEL-5d86e1b23401e578",
  "url": "/knowledge/can-the-next-step-start-before-the-whole-batch-is-ready",
  "id": "MHC-D-RESEARCH-0176",
  "version": "0.1.0",
  "title": "Can the next step start before the whole batch is ready?",
  "summary": "Finished work can still be trapped behind unfinished neighbours.",
  "kind": "question",
  "body": "Finished work can still be trapped behind unfinished neighbours.",
  "limits": [
    "Some operations require atomic batches, stable interfaces or costly setup. Do not split work below its safe and meaningful unit merely to increase movement."
  ],
  "topics": [
    "project-delivery"
  ],
  "intents": [],
  "source_ids": [
    "lei-continuous-flow"
  ],
  "evidence": [
    {
      "claim": "Moving smaller transfer batches can reduce waiting for an entire batch to finish at the previous step.",
      "source_id": "lei-continuous-flow",
      "role": "supports",
      "note": "Claim basis: professional_convention. Claim limit: Transfer overhead, technical dependencies and safety requirements may limit batch reduction.\nSource access: selected_html_passages; accessed on: 2026-09-17; inspected sections: [\"Moving small batches between process steps\"].\nAgent release review: Checked the named definitions in the May 2025 Kanban Guide, LEI and Meadows. Non-manufacturing examples are editorial applications. The text preserves safe-stop, ownership and contextual boundaries.",
      "locator": "Definition"
    }
  ],
  "use_when": [
    "Completed pieces wait for the rest of a large batch before anyone can review or use them."
  ],
  "avoid_when": [
    "Some operations require atomic batches, stable interfaces or costly setup. Do not split work below its safe and meaningful unit merely to increase movement."
  ],
  "question": "What is the smallest coherent transfer the next step can use safely?\n\nWould earlier transfer reduce waiting or expose errors sooner without excessive overhead?",
  "example": "A reviewer can check a complete section while the writer finishes another. Waiting for fifty sections may delay discovery of a shared structural mistake.",
  "check": "Is the smaller transfer independently usable rather than an incomplete fragment?",
  "published_at": "2026-11-12T18:37:40Z",
  "review": {
    "kind": "agent",
    "label": "Agent editorial and scoped source review",
    "reviewed_at": "2026-11-12T18:37:40Z"
  },
  "knowledge_origin": {
    "release_id": "MHC-RPUB-20261112-20287590",
    "corpus_commit": "20287590ddd3999b7492df232822b6a0f7d114b1",
    "manifest_sha256": "2a987660d12de0ce2bde77a421424f7762af1ff77872ef41093fecc33db74a95",
    "projection_sha256": "2807da39bbe6a3dee2db32a76675ac5185f5a33e8b0a5cdd0c22a4731f3378a0",
    "published_at": "2026-11-12T18:37:40Z"
  },
  "editorial_overlay": null,
  "editorial": null,
  "notices": [],
  "sources": [
    {
      "id": "lei-continuous-flow",
      "title": "Continuous Flow",
      "url": "https://www.lean.org/lexicon-terms/continuous-flow/"
    }
  ],
  "relations": [
    {
      "from": "MHC-D-RESEARCH-0176",
      "to": "MHC-D-RESEARCH-0177",
      "type": "useful_with",
      "url": "/knowledge/prepare-the-changeover-before-the-scarce-resource-stops"
    }
  ],
  "collections": [
    {
      "id": "RC-MHC-PRACTICE-PROJECT-DELIVERY",
      "title": "Practical project checks",
      "url": "/collections/practical-project-checks"
    }
  ],
  "topic_hubs": [
    {
      "id": "project-delivery",
      "title": "Project delivery",
      "url": "/topics/project-delivery"
    }
  ],
  "solution_packs": []
}
