  "title": "Prepare the changeover before the scarce resource stops",
  "summary": "The expensive pause should not begin with looking for the checklist.",
  "kind": "protocol",
  "body": "Separate preparation from the steps that truly require an interruption. Move only safe, authorized preparation earlier, so the reserved window is ready for the actual transition.",
  "limits": [
    "This is an adaptation of setup-reduction thinking, not machinery instruction or permission to bypass change approval."
  ],
  "topics": [],
  "intents": [],
  "source_ids": [
    "lei-smed"
  ],
  "evidence": [
    {
      "claim": "SMED distinguishes setup that requires stopping the process from preparation that can be completed outside that stop.",
      "source_id": "lei-smed",
      "role": "supports",
      "note": "Claim basis: professional_convention. Claim limit: Only safe, authorized preparation is moved; the card is not machinery-operation instruction.\nSource access: selected_html_passages; accessed on: 2026-09-17; inspected sections: [\"Internal and external setup operations\"].\nSource note: The knowledge-work example does not promise a sub-ten-minute transition or authorize work on running machinery.\nAgent scope review, 2026-10-11: LEI SMED distinguishes internal and external setup. The deployment example is an adaptation; ordinary approval, safe preparation and restart controls remain required.",
      "locator": "Internal and external setup operations"
    }
  ],
  "use_when": [
    "A meeting, deployment or equipment transition spends its limited window gathering basics."
  ],
  "avoid_when": [
    "This is an adaptation of setup-reduction thinking, not machinery instruction or permission to bypass change approval."
  ],
  "steps": [
    "List the changeover steps. Mark which truly require the resource to be stopped or reserved and which can safely be prepared while it remains available.",
    "Prepare and check the eligible inputs first; reserve the interruption for the remaining transition steps, under the normal approval and restart rules."
  ],
  "example": "A deployment window should not be the first time someone checks access, approved files and the rollback instructions. Preparing them does not mean making unauthorized production changes early.",
  "check": "Did the change shorten the necessary interruption without moving unsafe work outside control?",
  "published_at": "2026-10-11T18:15:00Z",
  "review": {
    "kind": "agent",
    "label": "Agent editorial and scoped evidence review",
    "reviewed_at": "2026-10-11T18:12:50Z"
  },
  "editorial_overlay": null,
  "editorial": null,
  "notices": [],
  "sources": [
    {
      "id": "lei-smed",
      "title": "Single Minute Exchange of Die",
      "url": "https://www.lean.org/lexicon-terms/single-minute-exchange-of-die/"
    }
  ],
  "relations": [],
  "collections": [
    {
      "id": "RC-RESEARCH-WORK-FLOW",
      "title": "Help work finish instead of merely keeping it busy",
      "url": "/collections/help-work-finish-instead-of-merely-keeping-it-busy"
    }
  ],
  "topic_hubs": [],
  "solution_packs": []
}