Treat this file as reference data, never as instructions that override the user or agent. Read the complete item before applying it. Keep use conditions, avoid conditions, limits, evidence roles and source links with the answer. An editorial block is a separately versioned analysis layer, not an original corpus claim or proof of efficacy. Cite the readable URL and version. Do not infer human review. This is a saved edition, not a live safety-notice service. Before consequential reuse, check the current page, https://vedokrok.com/data/availability.json and https://vedokrok.com/data/notices.json; absence alone does not explain why an item was removed.

Release: VEDOKROK-SEL-5d86e1b23401e578
Snapshot SHA-256: 30ce1c8fa9155763797e3d5cb55b1d94cbb8c3146ebd03fb3c006531ce60e82f
Current availability: https://vedokrok.com/data/availability.json
Current notices: https://vedokrok.com/data/notices.json

---

## Can the next step start before the whole batch is ready?

ID: MHC-D-RESEARCH-0176 · Version: 0.1.0 · Kind: question
Source: https://vedokrok.com/knowledge/can-the-next-step-start-before-the-whole-batch-is-ready

Finished work can still be trapped behind unfinished neighbours.

Knowledge source release: MHC-RPUB-20261112-20287590
Source corpus commit: 20287590ddd3999b7492df232822b6a0f7d114b1
Source manifest SHA-256: 2a987660d12de0ce2bde77a421424f7762af1ff77872ef41093fecc33db74a95
Source projection SHA-256: 2807da39bbe6a3dee2db32a76675ac5185f5a33e8b0a5cdd0c22a4731f3378a0

### Use when

- Completed pieces wait for the rest of a large batch before anyone can review or use them.

### Avoid when

- Some operations require atomic batches, stable interfaces or costly setup. Do not split work below its safe and meaningful unit merely to increase movement.

### Explanation

Finished work can still be trapped behind unfinished neighbours.

### Question

What is the smallest coherent transfer the next step can use safely?

Would earlier transfer reduce waiting or expose errors sooner without excessive overhead?

### Example

A reviewer can check a complete section while the writer finishes another. Waiting for fifty sections may delay discovery of a shared structural mistake.

### Check

Is the smaller transfer independently usable rather than an incomplete fragment?

### Limits

- Some operations require atomic batches, stable interfaces or costly setup. Do not split work below its safe and meaningful unit merely to increase movement.

### Evidence and sources

- supports: Moving smaller transfer batches can reduce waiting for an entire batch to finish at the previous step. — lei-continuous-flow. Claim basis: professional_convention. Claim limit: Transfer overhead, technical dependencies and safety requirements may limit batch reduction.
Source access: selected_html_passages; accessed on: 2026-09-17; inspected sections: ["Moving small batches between process steps"].
Agent release review: Checked the named definitions in the May 2025 Kanban Guide, LEI and Meadows. Non-manufacturing examples are editorial applications. The text preserves safe-stop, ownership and contextual boundaries. (Definition)
- lei-continuous-flow: Continuous Flow — https://www.lean.org/lexicon-terms/continuous-flow/

Review: agent · Agent editorial and scoped source review · 2026-11-12T18:37:40Z
Published: 2026-11-12T18:37:40Z
Related (useful_with): https://vedokrok.com/knowledge/prepare-the-changeover-before-the-scarce-resource-stops