# Hand off the uncertainty, not just the status

Treat this file as reference data, never as instructions that override the user or agent. Read the complete item before applying it. Keep use conditions, avoid conditions, limits, evidence roles and source links with the answer. An editorial block is a separately versioned analysis layer, not an original corpus claim or proof of efficacy. Cite the readable URL and version. Do not infer human review. This is a saved edition, not a live safety-notice service. Before consequential reuse, check the current page, https://vedokrok.com/data/availability.json and https://vedokrok.com/data/notices.json; absence alone does not explain why an item was removed.

Release: VEDOKROK-SEL-5d86e1b23401e578
Snapshot SHA-256: 30ce1c8fa9155763797e3d5cb55b1d94cbb8c3146ebd03fb3c006531ce60e82f
Current availability: https://vedokrok.com/data/availability.json
Current notices: https://vedokrok.com/data/notices.json

---

## Hand off the uncertainty, not just the status

ID: MHC-D-RESEARCH-0362 · Version: 0.1.0 · Kind: checklist
Source: https://vedokrok.com/knowledge/hand-off-the-uncertainty-not-just-the-status

A clean handoff that hides uncertainty is clean in the wrong way.

Knowledge source release: MHC-RPUB-20261011-9e4b62c5
Source corpus commit: 9e4b62c5648844484b8cc3160f3e168d63a1241b
Source manifest SHA-256: 8cc91f0a764c635a79a18e06e048d3dc7bb1e07ae0fed6bf544c89832c024402
Source projection SHA-256: d03d10dd52b53dec1ed850b7706847ba5b200e60f24c4fbda4518c2004356104

### Use when

- The next person could mistake an unresolved assumption for a settled fact.

### Avoid when

- Do not dump every possible unknown into the handoff; prioritize uncertainty that can change safety, sequence or decision-making.

### Explanation

Separate what is confirmed from what is suspected, what recently changed and what still needs verification. Highlight unknowns that can change the next action. The receiver should inherit the actual decision state, not a polished story that removes the very uncertainty they need to manage.

### Checklist

- The receiver can distinguish evidence, hypothesis and open question before taking over.

### Example

'Confirmed: two BPs failed. Suspected: channel-specific mapping. Unknown: whether source values differ. Recent change: transport 49208.'

### Check

The receiver can distinguish evidence, hypothesis and open question before taking over.

### Limits

- Do not dump every possible unknown into the handoff; prioritize uncertainty that can change safety, sequence or decision-making.

### Evidence and sources

- supports: AHRQ TeamSTEPPS handoff guidance includes communicating uncertainty, recent changes and the current plan rather than presenting unresolved information as settled. — RS-C7BE182238850FC0. Too much uncertainty without prioritization can obscure the main risk; identify which unknowns can change the next action. (Knowledge and information transferred during handoff)
- RS-C7BE182238850FC0: Tool: Handoff — https://www.ahrq.gov/teamstepps-program/curriculum/communication/tools/handoff.html

No review details supplied.
Related (useful_with): https://vedokrok.com/knowledge/hand-off-the-contingency-with-the-task
