Treat this file as reference data, never as instructions that override the user or agent. Read the complete item before applying it. Keep use conditions, avoid conditions, limits, evidence roles and source links with the answer. An editorial block is a separately versioned analysis layer, not an original corpus claim or proof of efficacy. Cite the readable URL and version. Do not infer human review. This is a saved edition, not a live safety-notice service. Before consequential reuse, check the current page, https://vedokrok.com/data/availability.json and https://vedokrok.com/data/notices.json; absence alone does not explain why an item was removed.

Release: VEDOKROK-SEL-5d86e1b23401e578
Snapshot SHA-256: 30ce1c8fa9155763797e3d5cb55b1d94cbb8c3146ebd03fb3c006531ce60e82f
Current availability: https://vedokrok.com/data/availability.json
Current notices: https://vedokrok.com/data/notices.json

---

## Put the slow external dependency on the forecast

ID: MHC-D-RESEARCH-0623 · Version: 0.1.0 · Kind: checklist
Source: https://vedokrok.com/knowledge/put-the-slow-external-dependency-on-the-forecast

The calendar belongs partly to whoever must answer next.

Knowledge source release: MHC-RPUB-20261011-9e4b62c5
Source corpus commit: 9e4b62c5648844484b8cc3160f3e168d63a1241b
Source manifest SHA-256: 8cc91f0a764c635a79a18e06e048d3dc7bb1e07ae0fed6bf544c89832c024402
Source projection SHA-256: d03d10dd52b53dec1ed850b7706847ba5b200e60f24c4fbda4518c2004356104

### Use when

- A plan estimates only work controlled by the team.

### Avoid when

- Do not turn dependency tracking into blame; the goal is to model the real system and improve it.

### Explanation

Name approvals, vendor responses, environments, data deliveries and other dependencies that can block progress. For each, record owner, expected response window and fallback or escalation. If one dependency can dominate delivery, surface it in the headline forecast.

### Checklist

- External dependencies named.
- Owner or provider named.
- Expected response window recorded.
- Fallback or escalation path exists.
- Dominant dependency visible in the delivery forecast.

### Example

A transport can be prepared today but production import depends on a change manager's approval window; the forecast states that dependency explicitly.

### Check

A missed delivery can be decomposed into controlled work and dependency latency.

### Limits

- Do not turn dependency tracking into blame; the goal is to model the real system and improve it.

### Evidence and sources

- supports: IPA cost-estimating guidance recommends documenting assumptions and representing uncertainty with reasonably optimistic, most-likely and reasonably pessimistic positions where appropriate. — RS-B3FC6B5B65061AB3. Three-point estimates are inputs to judgment or modelling, not proof of a probability distribution. (Estimate ranges and assumptions)
- supports: IPA guidance notes that uncertainty and estimate range depend on the maturity and variability of input data, so estimates should evolve as design and evidence mature. — RS-B3FC6B5B65061AB3. A later estimate can still be wrong; maturity narrows uncertainty only when real information has improved. (Estimate maturity and range)
- RS-B3FC6B5B65061AB3: Cost Estimating Guidance — https://www.gov.uk/government/publications/cost-estimating-guidance/cost-estimating-guidance

No review details supplied.