# Pin the scope snapshot to every material forecast

Treat this file as reference data, never as instructions that override the user or agent. Read the complete item before applying it. Keep use conditions, avoid conditions, limits, evidence roles and source links with the answer. An editorial block is a separately versioned analysis layer, not an original corpus claim or proof of efficacy. Cite the readable URL and version. Do not infer human review. This is a saved edition, not a live safety-notice service. Before consequential reuse, check the current page, https://vedokrok.com/data/availability.json and https://vedokrok.com/data/notices.json; absence alone does not explain why an item was removed.

Release: VEDOKROK-SEL-5d86e1b23401e578
Snapshot SHA-256: 30ce1c8fa9155763797e3d5cb55b1d94cbb8c3146ebd03fb3c006531ce60e82f
Current availability: https://vedokrok.com/data/availability.json
Current notices: https://vedokrok.com/data/notices.json

---

## Pin the scope snapshot to every material forecast

ID: MHC-D-RESEARCH-0629 · Version: 0.1.0 · Kind: protocol
Source: https://vedokrok.com/knowledge/pin-the-scope-snapshot-to-every-material-forecast

A forecast can be wrong; it can also be about a different job.

Knowledge source release: MHC-RPUB-20261011-9e4b62c5
Source corpus commit: 9e4b62c5648844484b8cc3160f3e168d63a1241b
Source manifest SHA-256: 8cc91f0a764c635a79a18e06e048d3dc7bb1e07ae0fed6bf544c89832c024402
Source projection SHA-256: d03d10dd52b53dec1ed850b7706847ba5b200e60f24c4fbda4518c2004356104

### Use when

- A forecast is later judged against a project that changed shape.

### Avoid when

- Do not freeze harmless wording changes into formal re-estimation; use a materiality threshold appropriate to the work.

### Explanation

Store the estimate with its scope version or a short snapshot of included deliverables, assumptions and dependencies. When scope changes materially, create a new forecast and preserve the old one for learning rather than silently editing history.

### Steps

1. Forecast date recorded.
2. Scope/version recorded.
3. Key assumptions recorded.
4. Material change creates a new forecast.
5. Old forecast preserved for calibration.

### Example

The original estimate covered 1,000 records; after the scope grows to 1,800, the revised estimate is a new forecast rather than a rewrite of the original.

### Check

Forecast error can be separated from scope change.

### Limits

- Do not freeze harmless wording changes into formal re-estimation; use a materiality threshold appropriate to the work.

### Evidence and sources

- supports: The 2026 Green Book recommends explicitly accounting for optimism bias in cost, benefit and duration estimates and using historical forecast errors from similar proposals where available. — RS-F874002E4A58CC3B. The guidance is for UK public appraisal; the transferable principle is empirical correction, not a universal percentage uplift. (Optimism bias)
- supports: IPA guidance notes that uncertainty and estimate range depend on the maturity and variability of input data, so estimates should evolve as design and evidence mature. — RS-B3FC6B5B65061AB3. A later estimate can still be wrong; maturity narrows uncertainty only when real information has improved. (Estimate maturity and range)
- RS-F874002E4A58CC3B: The Green Book (2026) — https://www.gov.uk/government/publications/the-green-book-appraisal-and-evaluation-in-central-government/the-green-book-2026
- RS-B3FC6B5B65061AB3: Cost Estimating Guidance — https://www.gov.uk/government/publications/cost-estimating-guidance/cost-estimating-guidance

No review details supplied.
Related (use_before): https://vedokrok.com/knowledge/re-estimate-when-evidence-changes-not-when-anxiety-spikes
