# Count rework as a forecast component

Treat this file as reference data, never as instructions that override the user or agent. Read the complete item before applying it. Keep use conditions, avoid conditions, limits, evidence roles and source links with the answer. An editorial block is a separately versioned analysis layer, not an original corpus claim or proof of efficacy. Cite the readable URL and version. Do not infer human review. This is a saved edition, not a live safety-notice service. Before consequential reuse, check the current page, https://vedokrok.com/data/availability.json and https://vedokrok.com/data/notices.json; absence alone does not explain why an item was removed.

Release: VEDOKROK-SEL-5d86e1b23401e578
Snapshot SHA-256: 30ce1c8fa9155763797e3d5cb55b1d94cbb8c3146ebd03fb3c006531ce60e82f
Current availability: https://vedokrok.com/data/availability.json
Current notices: https://vedokrok.com/data/notices.json

---

## Count rework as a forecast component

ID: MHC-D-RESEARCH-0631 · Version: 0.1.0 · Kind: checklist
Source: https://vedokrok.com/knowledge/count-rework-as-a-forecast-component

The second pass still consumes the calendar.

Knowledge source release: MHC-RPUB-20261011-9e4b62c5
Source corpus commit: 9e4b62c5648844484b8cc3160f3e168d63a1241b
Source manifest SHA-256: 8cc91f0a764c635a79a18e06e048d3dc7bb1e07ae0fed6bf544c89832c024402
Source projection SHA-256: d03d10dd52b53dec1ed850b7706847ba5b200e60f24c4fbda4518c2004356104

### Use when

- Plans assume work flows forward once, even when review and correction are normal.

### Avoid when

- Do not normalize chronic avoidable defects as inevitable rework; use the data to improve the process.

### Explanation

For work with known review loops, estimate expected correction and revalidation effort explicitly rather than pretending first-pass acceptance is the default. Track why rework occurred so avoidable defects can be separated from normal iteration.

### Checklist

- Review step included.
- Typical correction loop included.
- Revalidation included.
- Avoidable defect rework tagged separately.
- Unexpected rework captured for later learning.

### Example

A data migration estimate includes one validation-and-correction cycle instead of treating every failed row as an unforeseeable surprise.

### Check

The plan includes the repeat work that normally occurs in comparable deliveries.

### Limits

- Do not normalize chronic avoidable defects as inevitable rework; use the data to improve the process.

### Evidence and sources

- supports: The 2026 Green Book recommends explicitly accounting for optimism bias in cost, benefit and duration estimates and using historical forecast errors from similar proposals where available. — RS-F874002E4A58CC3B. The guidance is for UK public appraisal; the transferable principle is empirical correction, not a universal percentage uplift. (Optimism bias)
- supports: Supplementary Green Book optimism-bias guidance recommends basing adjustments on data from past or similar projects and collecting local data to improve future estimates. — RS-3AABED087865223D. Reference classes must be genuinely comparable; irrelevant historical projects can make an estimate worse. (Introduction and making adjustments)
- RS-F874002E4A58CC3B: The Green Book (2026) — https://www.gov.uk/government/publications/the-green-book-appraisal-and-evaluation-in-central-government/the-green-book-2026
- RS-3AABED087865223D: Supplementary Green Book Guidance: Optimism Bias — https://assets.publishing.service.gov.uk/media/5a74dae740f0b65f61322c72/Optimism_bias.pdf

No review details supplied.
Related (useful_with): https://vedokrok.com/knowledge/explain-forecast-error-by-component
