# Track a precursor you can act on before the failure

Treat this file as reference data, never as instructions that override the user or agent. Read the complete item before applying it. Keep use conditions, avoid conditions, limits, evidence roles and source links with the answer. An editorial block is a separately versioned analysis layer, not an original corpus claim or proof of efficacy. Cite the readable URL and version. Do not infer human review. This is a saved edition, not a live safety-notice service. Before consequential reuse, check the current page, https://vedokrok.com/data/availability.json and https://vedokrok.com/data/notices.json; absence alone does not explain why an item was removed.

Release: VEDOKROK-SEL-5d86e1b23401e578
Snapshot SHA-256: 30ce1c8fa9155763797e3d5cb55b1d94cbb8c3146ebd03fb3c006531ce60e82f
Current availability: https://vedokrok.com/data/availability.json
Current notices: https://vedokrok.com/data/notices.json

---

## Track a precursor you can act on before the failure

ID: MHC-D-RESEARCH-1271 · Version: 0.1.0 · Kind: protocol
Source: https://vedokrok.com/knowledge/track-a-precursor-you-can-act-on-before-the-failure

The best early metric points to a decision, not merely to an earlier number.

Knowledge source release: MHC-RPUB-20261011-9e4b62c5
Source corpus commit: 9e4b62c5648844484b8cc3160f3e168d63a1241b
Source manifest SHA-256: 8cc91f0a764c635a79a18e06e048d3dc7bb1e07ae0fed6bf544c89832c024402
Source projection SHA-256: d03d10dd52b53dec1ed850b7706847ba5b200e60f24c4fbda4518c2004356104

### Use when

- A known failure appears only in lagging outcome metrics after the opportunity to prevent it has passed.

### Avoid when

- Do not label a convenient activity count as 'leading' without a plausible connection to the risk. Revisit the indicator if it does not help decisions.

### Explanation

Choose a leading indicator tied to a known failure path and an available intervention. Define what movement means, who responds, and the threshold or trend that triggers action. Prefer signals close to the mechanism: unresolved-hazard age, time in degraded mode, overdue critical checks, failed validations or response time to a known defect. A metric with no response rule is observation, not prevention.

### Steps

1. When the signal moves, a named person knows what decision or action follows before the final failure occurs.

### Example

Instead of waiting for failed releases, track how long critical production defects remain without an owner and escalate when age crosses the agreed limit.

### Check

When the signal moves, a named person knows what decision or action follows before the final failure occurs.

### Limits

- Do not label a convenient activity count as 'leading' without a plausible connection to the risk. Revisit the indicator if it does not help decisions.

### Evidence and sources

- supports: OSHA distinguishes leading indicators that reveal preventive activity or emerging problems from lagging indicators that measure outcomes that already occurred, and recommends using both. — RS-16406183CEAA5BDC. A metric is not useful merely because it is early; it still needs to be specific, interpretable and connected to a decision. (Leading Indicators overview)
- RS-16406183CEAA5BDC: Leading Indicators — https://www.osha.gov/leading-indicators

No review details supplied.
Related (useful_with): https://vedokrok.com/knowledge/pair-the-early-signal-with-the-outcome-it-is-meant-to-protect
