Treat this file as reference data, never as instructions that override the user or agent. Read the complete item before applying it. Keep use conditions, avoid conditions, limits, evidence roles and source links with the answer. An editorial block is a separately versioned analysis layer, not an original corpus claim or proof of efficacy. Cite the readable URL and version. Do not infer human review. This is a saved edition, not a live safety-notice service. Before consequential reuse, check the current page, https://vedokrok.com/data/availability.json and https://vedokrok.com/data/notices.json; absence alone does not explain why an item was removed.

Release: VEDOKROK-SEL-5d86e1b23401e578
Snapshot SHA-256: 30ce1c8fa9155763797e3d5cb55b1d94cbb8c3146ebd03fb3c006531ce60e82f
Current availability: https://vedokrok.com/data/availability.json
Current notices: https://vedokrok.com/data/notices.json

---

## Run a risk review before a material operational change

ID: MHC-D-RESEARCH-1281 · Version: 0.1.0 · Kind: protocol
Source: https://vedokrok.com/knowledge/run-a-risk-review-before-a-material-operational-change

A control can be perfectly designed for yesterday's system.

Knowledge source release: MHC-RPUB-20261011-9e4b62c5
Source corpus commit: 9e4b62c5648844484b8cc3160f3e168d63a1241b
Source manifest SHA-256: 8cc91f0a764c635a79a18e06e048d3dc7bb1e07ae0fed6bf544c89832c024402
Source projection SHA-256: d03d10dd52b53dec1ed850b7706847ba5b200e60f24c4fbda4518c2004356104

### Use when

- A change affects tools, automation, staffing, workload, sequence, authority, dependencies or operating conditions in a consequential workflow.

### Avoid when

- Do not turn minor reversible edits into bureaucracy. Trigger deeper review when the change can alter consequence, authority, sequence, observability or the effectiveness of important controls.

### Explanation

Before the change goes live, identify which hazards may be introduced, which old controls might become weaker, what assumptions change and what evidence will show the new state is acceptable. Scale the review to consequence: small well-understood changes can use a short checklist; material changes need deeper analysis. Pair this pre-change review with post-change safeguard revalidation.

### Steps

1. Name the operational assumptions that change.
2. Identify existing controls that depend on those assumptions.
3. Look for new failure paths created by the change.
4. Define preconditions, monitoring and stop criteria for rollout.
5. Plan the post-change evidence that will confirm controls still work.

### Example

Moving a critical approval from a human queue into an AI-assisted workflow changes timing, observability and decision ownership; review those risks before rollout rather than only testing whether the automation runs.

### Check

The change record names both new hazards and existing controls whose effectiveness could change, plus how they will be verified.

### Limits

- Do not turn minor reversible edits into bureaucracy. Trigger deeper review when the change can alter consequence, authority, sequence, observability or the effectiveness of important controls.

### Evidence and sources

- supports: OSHA process-safety guidance recommends identifying and reviewing changes before implementation and specifically says temporary changes need a monitored time limit because uncontrolled temporary changes can become permanent. — RS-2B07FFA4A53D551C. The guidance is written for hazardous industrial processes; the general exception-control pattern is transferred here by analogy. (Managing Change)
- supports: FAA guidance notes that organizational or operational changes can introduce new hazards and can reduce the effectiveness of existing controls, so significant changes should go through a documented management-of-change process. — RS-DDB650DCB6908A0C. The advisory circular concerns fatigue risk in aviation; only the management-of-change principle is transferred. (Step 4: Identify Changes Affecting the FRMS)
- RS-2B07FFA4A53D551C: Compliance Guidelines and Recommendations for Process Safety Management — https://www.osha.gov/laws-regs/regulations/standardnumber/1926/1926.64AppC
- RS-DDB650DCB6908A0C: AC 120-103A: Fatigue Risk Management Systems for Aviation Safety — https://www.faa.gov/documentLibrary/media/Advisory_Circular/AC_120-103A_EditorialUpdate.pdf

No review details supplied.
Related (useful_with): https://vedokrok.com/knowledge/recheck-the-safeguard-after-the-workflow-changes