Treat this file as reference data, never as instructions that override the user or agent. Read the complete item before applying it. Keep use conditions, avoid conditions, limits, evidence roles and source links with the answer. An editorial block is a separately versioned analysis layer, not an original corpus claim or proof of efficacy. Cite the readable URL and version. Do not infer human review. This is a saved edition, not a live safety-notice service. Before consequential reuse, check the current page, https://vedokrok.com/data/availability.json and https://vedokrok.com/data/notices.json; absence alone does not explain why an item was removed.

Release: VEDOKROK-SEL-5d86e1b23401e578
Snapshot SHA-256: 30ce1c8fa9155763797e3d5cb55b1d94cbb8c3146ebd03fb3c006531ce60e82f
Current availability: https://vedokrok.com/data/availability.json
Current notices: https://vedokrok.com/data/notices.json

---

## Compare work estimates and delivery dates separately

ID: MHC-D-RESEARCH-9792 · Version: 0.1.0 · Kind: protocol
Source: https://vedokrok.com/knowledge/compare-work-estimates-and-delivery-dates-separately

An hour of work and two days of waiting are different planning problems.

Knowledge source release: MHC-RPUB-20261112-20287590
Source corpus commit: 20287590ddd3999b7492df232822b6a0f7d114b1
Source manifest SHA-256: 2a987660d12de0ce2bde77a421424f7762af1ff77872ef41093fecc33db74a95
Source projection SHA-256: 2807da39bbe6a3dee2db32a76675ac5185f5a33e8b0a5cdd0c22a4731f3378a0

### Use when

- The same work always takes longer than planned.

### Avoid when

- Completed-task records leave out still-blocked work. Small or selected samples do not establish a reliable forecast; a past average is not a guaranteed delivery date.

### Explanation

For similar completed tasks, compare estimated working hours with actual working hours, and expected delivery date with actual delivery date. Use the same meaning of finished, such as approved rather than drafted. Note waiting, review and rework to explain a miss. Record start and finish when comparing elapsed time; overlapping activities cannot simply be added together.

### Steps

1. Save both estimates before starting, then record the actual hours and delivery date. Keep the units and completion condition consistent.
2. Use the records to revise the next assumption: the work needed more effort, approval arrived later, or the task changed. Mark an unknown cause as unknown.

### Example

Illustrative: a change takes the estimated one hour to write, but approval moves delivery from Monday to Wednesday. The work-hour estimate held; the delivery-date estimate did not.

### Check

You can show each estimate beside its matching result and explain which assumption needs revision, without calling waiting time extra working hours.

### Limits

- Completed-task records leave out still-blocked work. Small or selected samples do not establish a reliable forecast; a past average is not a guaranteed delivery date.

### Evidence and sources

- supports: UK government delivery guidance suggests regular explicit prioritization based on evidence, user research and available resources. — time-priority. Claim limit: General public-service prioritisation guidance. It does not prescribe the card-specific effort/date comparison or establish forecasting accuracy. Commitment substitution and estimate review are editorial adaptations, not demonstrated productivity effects.
Source reading history: selected_passages; 2026-10-10; Regular priority review using user research, delivery performance and stakeholders. The cited official page was retrieved on 2026-10-10 and the named passages were inspected. Card-specific adaptations are independent editorial reasoning, not validated improvements. Introductory prioritisation and capacity passages reread on 2026-10-12; they do not specify the card-specific forecasting procedure.
Agent release review: Atlassian calendar guidance and the UK Government Service Manual supply context for calendar and prioritization practices. The precise estimate comparison and scheduling methods are editorial adaptations; the original data and emergency limits remain attached. (Regular priority review using user research, delivery performance and stakeholders)
- time-priority: Deciding on priorities — https://www.gov.uk/service-manual/agile-delivery/deciding-on-priorities

Review: agent · Agent editorial and scoped source review · 2026-11-12T18:37:40Z
Published: 2026-11-12T18:37:40Z
Related (useful_with): https://vedokrok.com/knowledge/subtract-fixed-obligations-before-promising-the-day