Checklist
Separate touch time from queue time
Elapsed time contains different levers.
Before you use it
- Use when
- When a task feels 'slow' but nobody knows whether work itself or waiting dominates.
Keep this limit in mind
- Queueing equations have specific assumptions. Use them for directional reasoning and measurement design, not as exact forecasts for arbitrary multi-stage knowledge work.
An idea to explore.
Try this idea.
Inspect the example, try the idea in your situation, then check your next move.
Checklist
- Timestamp start and finish.
- Estimate active touch time.
- Classify major waiting intervals.
- Measure rework separately.
Why it matters
For a sample of items, split active processing, waiting for people, waiting for systems and rework. Target the largest controllable component instead of speeding every step.
An example
A change takes five days elapsed but only ninety minutes of active work; approval and environment waits dominate.
Check your result
The improvement target corresponds to the largest material time component.
Save and practise this idea
My learning
Read. Recall. Repeat.
Save this idea and return to it on any device.
Keep exploring
Connected ideas
You are readingSeparate touch time from queue time
Ideas that link here
These ideas link to this one. Check their conditions and limits before use.
Useful with this ideaMove quality checks upstream of the bottleneck
Evidence and sources
Little's Law relates long-run average work in a stable system to arrival/throughput rate and average time in system as L = λW under stated mathematical conditions.
The relation does not identify root cause, queue discipline or the correct intervention; workplace applications must respect the assumptions.
A Proof for the Queuing Formula: L = λW · Abstract
All sources (1)
Edition and review
Version 0.1.0
No review details are supplied for this edition.