Collection

Practical project checks

Make work, handoffs and changes easier to inspect.

Explore in any order.

What’s included

1 checklist · 2 concepts · 2 principles · 5 protocols · 1 question · 1 template

Narrow your search

12 ideas

Protocol

Limit started work, not just the length of the to-do list

Starting is cheap when nobody counts what it leaves open.

Read the idea
Concept

Keep the probability in a delivery forecast

A forecast loses its meaning when its uncertainty is edited out.

Read the idea
Protocol

Separate time spent working from time spent waiting

The customer experiences the queue as part of the process.

Read the idea
Question

Can the next step start before the whole batch is ready?

Finished work can still be trapped behind unfinished neighbours.

Read the idea
Principle

Write the current method so it can be improved

A standard is a shared starting point, not a museum exhibit.

Read the idea
Protocol

Stop the defect before it becomes a larger batch

High throughput is less impressive when it multiplies the same error.

Read the idea
Template

Give the warning a responder and a response

A warning without a response path is coloured wallpaper.

Read the idea
Protocol

Change the design so the mistake has less room to happen

A better warning is not always the best prevention.

Read the idea
Concept

Distinguish the pile from the rate changing it

The pile remembers yesterday's difference between arrivals and departures.

Read the idea
Principle

Allow for the response delay before adjusting again

Impatience can become part of the feedback loop.

Read the idea
Checklist

Keep user, buyer and approver as separate people

Interest and purchasing authority are different assets.

Read the idea
Protocol

Test a payment signal before building the feature

A smaller transaction is a stronger signal than a bigger opinion.

Read the idea