Question
Can the next step start before the whole batch is ready?
Finished work can still be trapped behind unfinished neighbours.
Before you use it
- Use when
- Completed pieces wait for the rest of a large batch before anyone can review or use them.
Keep this limit in mind
- Some operations require atomic batches, stable interfaces or costly setup. Do not split work below its safe and meaningful unit merely to increase movement.
An idea to explore.
Try this idea.
Inspect the example, try the idea in your situation, then check your next move.
A question to ask
What is the smallest coherent transfer the next step can use safely?
Would earlier transfer reduce waiting or expose errors sooner without excessive overhead?
Why it matters
Finished work can still be trapped behind unfinished neighbours.
An example
A reviewer can check a complete section while the writer finishes another. Waiting for fifty sections may delay discovery of a shared structural mistake.
Check your result
Is the smaller transfer independently usable rather than an incomplete fragment?
Save and practise this idea
My learning
Read. Recall. Repeat.
Save this idea and return to it on any device.
Keep exploring
Connected ideas
You are readingCan the next step start before the whole batch is ready?
Evidence and sources
Moving smaller transfer batches can reduce waiting for an entire batch to finish at the previous step.
Claim basis: professional_convention. Claim limit: Transfer overhead, technical dependencies and safety requirements may limit batch reduction. Source access: selected_html_passages; accessed on: 2026-09-17; inspected sections: ["Moving small batches between process steps"]. Agent release review: Checked the named definitions in the May 2025 Kanban Guide, LEI and Meadows. Non-manufacturing examples are editorial applications. The text preserves safe-stop, ownership and contextual boundaries.
Continuous Flow · Definition
All sources (1)
Edition and review
Version 0.1.0 · Published
Edition checked · 2026-11-12