Principle

Estimate the work and the calendar separately

Six person-hours of work do not promise a result six hours from now. A delivery forecast also needs the people’s availability, the sequence and the waits.

About 2 min read

Before you use it

Use when
  • A task contains approvals, queues or external waits and one duration number hides them.

Keep this limit in mind

  • Wait times can dominate delivery and may be highly variable; do not pretend they are fixed just because the active work is well known.

Current editorial reading

Give each number a unit

Record the required effort in person-hours or person-days. Separately state the forecast start and finish, the working calendar and the assumptions about available capacity. A hypothetical review needing three person-hours may wait until tomorrow because its only qualified reviewer is unavailable today.

Build the route to completion

Place required work and dependencies in order, identify what can genuinely run in parallel, and account for approval windows and other waits. Keep uncertain waits visible instead of treating them as fixed just because the active work is familiar. If more people are proposed, check that the work can be divided and that coordination does not consume the expected saving.

Take it with you

Check that the forecast explains both the effort needed and the elapsed window. Do not silently switch between working days, calendar days and person-days, or assume twice the staff means half the duration.

Sources and evidence (1)

What we checked

Supports

GAO distinguishes work or effort from activity duration and makes duration depend on resource availability and the applicable working calendar.

Selected passages inspected on 2026-10-04, PDF pages62–63 and76. This directly supports the time distinction; the prior cost-range evidence alone was less specific. The review example is hypothetical.

Schedule Assessment Guide: Best Practices for Project Schedules · Best Practice3, Resources, Effort, and Duration, printed pp49–50; Best Practice4, printed p63

Limits

GAO warns that doubling available resources need not halve duration and that complex work may take longer as coordination increases.

This limits simple effort-to-time arithmetic. No staffing intervention or delivery improvement was tested here.

Schedule Assessment Guide: Best Practices for Project Schedules · Best Practice3, Labor Resources, printed p50 / PDF page63

Editorial sources (1)

Editorial version 1.0.0 · Evidence checked 2026-10-04

Save and practise this idea

My learning

Read. Recall. Repeat.

Save this idea and return to it on any device.

Use email
Keep exploring

Connected ideas

You are readingEstimate the work and the calendar separately

Original edition evidence and sources

These records belong to the original released edition. The current editorial reading has its own evidence above; neither set silently replaces the other.

Supports

IPA cost-estimating guidance recommends documenting assumptions and representing uncertainty with reasonably optimistic, most-likely and reasonably pessimistic positions where appropriate.

Three-point estimates are inputs to judgment or modelling, not proof of a probability distribution.

Cost Estimating Guidance · Estimate ranges and assumptions

Supports

IPA guidance notes that uncertainty and estimate range depend on the maturity and variability of input data, so estimates should evolve as design and evidence mature.

A later estimate can still be wrong; maturity narrows uncertainty only when real information has improved.

Cost Estimating Guidance · Estimate maturity and range

All sources (1)
Original edition, downloads and provenance

The reading above is editorial version 1.0.0, bound to this exact source edition. The original data and saved downloads retain that edition and the separate editorial layer. They may contain earlier wording; use the current reading above when interpreting it.

Version 0.1.0

No review details are supplied for this edition.

Read the original edition and overlay as JSON · Release details